AlphaPET
Polymer Plant Decatur, AlabamaPWM performed civil engineering and surveying for AlphaPET during the design and construction of a new 40 acres plant in Decatur, AL. Our scopes performed include site grading and drainage plans, roadways, highway approach designs for access, design of railroad facilities, and design of stormwater detention facilities, site utility design, topographic mapping, construction layout and staking for multi-million dollar plant. Coordinated adjacent grant project to design and administer the extension of water and sanitary sewer main to the site.
- Total Construction Cost: $80M
- Construction Cost of PWM Scope: $7.5M
- Construction Completion Date: Summer 2009