Hexcel

Polymer Plant Decatur, Alabama

PWM performed civil engineering and surveying for Hexcel during the design and construction of the Line D & E addition to their plant in Decatur, AL. Our scopes performed include site grading and drainage plans, roadways, design of stormwater facilities, site utility design, topographic mapping, construction layout and staking for multi-million dollar plant. These projects required significant coordination efforts with international design teams and with the Fluor and Hexcel team.

  • Total Construction Cost: $40M
  • Construction Cost of PWM Scope: $750K
  • Construction Completion Date: Spring 2009